Heat Recovery Steam Generator

Heat Recovery Steam Generator

Manufactured within our 13,800+ square meter heavy manufacturing complex in Jingjiang, our Heat Recovery Steam Generator is an industrial-grade waste heat boiler engineered to capture thermal energy from hot flue gases discharged by petrochemical fired heaters, ethylene crackers, and industrial furnaces to generate high-pressure saturated or superheated steam. Backed by 26 years of heavy fabrication experience and certified under ASME "S" and "U" stamps as well as Class A boiler manufacturing licenses, we build each Heat Recovery Steam Generator with optimized bare and finned tube banks, heavy-gauge pressure drums, and precision circulation circuits configured for either natural or forced circulation.
Send Inquiry
Product Description
Manufactured within our 13,800+ square meter heavy manufacturing complex in Jingjiang, our Heat Recovery Steam Generator is an industrial-grade waste heat boiler engineered to capture thermal energy from hot flue gases discharged by petrochemical fired heaters, ethylene crackers, and industrial furnaces to generate high-pressure saturated or superheated steam. Backed by 26 years of heavy fabrication experience and certified under ASME "S" and "U" stamps as well as Class A boiler manufacturing licenses, we build each Heat Recovery Steam Generator with optimized bare and finned tube banks, heavy-gauge pressure drums, and precision circulation circuits configured for either natural or forced circulation. By recovering high-grade waste heat that would otherwise be lost to the stack, this durable Heat Recovery Steam Generator lowers refinery fuel consumption, improves overall plant thermal efficiency to over 92%, and reduces greenhouse gas emissions, giving plant operators and global EPC contractors an energy-saving asset built for long-term continuous service.
product-800-800

 

Applications

Petrochemical Fired Heater Waste Heat Recovery: Generating medium-to-high pressure steam from flue gases discharged by crude distillation heaters, reformers, and vacuum furnaces.

Ethylene Plant Transfer Line Exchanger (TLE) Systems: Operating as secondary quench boilers and convection steam generators downstream of ethylene cracking furnaces.

Refinery Utility Steam Systems: Providing high-pressure steam for plant power generation, process stripping, steam turbine drives, and plant heating networks.

Industrial Flue Gas Heat Recovery: Capturing waste heat from metallurgical furnaces, incinerators, and chemical reactors to improve plant thermal efficiency.

 

Technical Specifications

Design & Fabrication Standards

ASME Section I (Power Boilers, "S" Stamp), ASME Section VIII Div. 1 ("U" Stamp), ASME B31.1, Class A Boiler Manufacturing License

Circulation Types

Natural circulation (thermosiphon) or forced circulation with dedicated circulation pump skids

Steam Generation Capacity

5 tons/hour to over 120 tons/hour per unit

Steam Pressure Rating

1.0 MPa to 10.0 MPa (Gauged to refinery utility steam headers)

Steam Temperature

Saturated steam up to superheated steam at 510°C

Flue Gas Inlet Temperature

350°C to 950°C

Heat Transfer Tube Banks

High-frequency resistance-welded solid or serrated finned tubes and bare shielding rows

Pressure Drum Construction

Heavy-wall carbon steel (SA-516 Gr. 70) with internal steam-water cyclonic separators and chevron mist eliminators

Thermal Heat Recovery Efficiency

Increases overall furnace-boiler combined efficiency to 92% – 95%

 

Customization Capabilities

Flexible Modular Configurations: Building horizontal or vertical gas-path configurations tailored to available plot space, duct arrangements, and foundation loads.

Complete Multi-Stage Preheating Integration: Integrating superheater, evaporator, economizer, and boiler feed water preheating coils within a single modular casing.

Custom Steam Drum Internals: Engineering internal steam-water cyclonic separators, chemical dosing manifolds, and continuous blowdown headers to ensure steam purity exceeding 99.5%.

Modular Pre-Assembled Construction: Fabricating modular casing blocks with pre-installed insulation and tube bundles to minimize field installation time and crane hours.

Zero MOQ Flexibility: Supplying single custom waste heat boiler units for turnaround revamps as well as complete multi-unit boiler plants for new grassroots industrial facilities.

 

Quality Control

Certified Boiler Accreditations: Manufactured under ASME "S" (Power Boilers) and "U" stamps, Class A Boiler Manufacturing License, and ISO 9001:2015 quality standards.

Component-Level QR Code Traceability: Every boiler drum plate, header pipe, finned tube spool, and pressure fitting is tracked through a serialized QR code linked directly to mill test reports and inspection records.

100% Comprehensive NDT & Inspection: 100% Radiographic Testing (RT) / Ultrasonic Testing (UT) on all longitudinal and circumferential drum welds, 100% Positive Material Identification (PMI), and hydrostatic pressure testing witnessed by certified boiler inspectors.

Third-Party Inspection Coordination: Full facilitation of customer audits and third-party inspections by BV, SGS, DNV, or TÜV at all critical quality hold points.

Export-Grade Heavy Packaging: Heavy-duty structural steel transport saddles, internal nitrogen purging for tube bundles, and weatherproof vacuum-barrier wraps for ocean transit.

 

FAQ

Q: How do you prevent low-temperature acid dew-point corrosion in the economizer section of the boiler?

A: We calculate the acid dew-point based on the sulfur content of the fuel gas and design the economizer inlet water temperature to remain safely above this threshold, using corrosion-resistant tube materials or air preheat integration where necessary.

Q: What is the typical fabrication lead time for a complete Heat Recovery Steam Generator?

A: Custom boiler fabrication typically requires 4 to 6 months from technical drawing approval and material procurement to final inspection and testing. Standard replacement tube bundles can be completed in approximately 3 months.

Q: What warranty coverage do you provide for international deliveries?

A: We provide an 18-month warranty from site arrival or 12 months from commercial operation (whichever comes first), backed by responsive technical engineering support.

Q: What payment terms and currencies do you accept for export contracts?

A: We support EXW and FOB shipping terms. Our standard commercial milestones are 30% advance deposit, 40% manufacturing milestone payment, and 30% balance prior to factory dispatch, payable in USD, EUR, or RMB.

 

Hot Tags: heat recovery steam generator, China heat recovery steam generator manufacturers, suppliers, factory, Enamel coated surface air preheater, exhaust heat recovery system, Recuperative And Regenerative Air Preheater, Rotary air preheater, The Waste Heat Boiler, Tubular air preheater